Your building's next six-figure surprise is already scheduled. It's called 2030.
The compliance desk reference for NYC co-op and condo board members — Local Law 97, benchmarking, facade safety, and every inspection your building owes the city, on one calendar. Plus an annual update so you never miss a rule change.
One-time purchase · 12 months of updates included
The problem
- Local Law 97 fines are $268 per ton of carbon over your building's cap — every year (subject to annual inflation adjustment; confirm the current year's rate before budgeting). A 750,000 sq ft building just 50% over its limit pays roughly $678,000 a year. The first fines have already been issued.
- The 2030 limits cut caps roughly in half. A 2023 city analysis projected ~63% of covered buildings would exceed them without action. "We passed 2024" is not a plan.
- Meanwhile the rest of the compliance stack keeps running: benchmarking due May 1 ($500/quarter fines), facade inspections on a 5-year cycle, gas piping on a 4-year cycle, boilers, elevators, cooling towers — each with its own inspector, filing, and penalty.
- Your managing agent handles the paperwork. But the board is legally responsible — and most board members can't name half the filings their building owes.
What you get
Local Law 97, in Plain English
Coverage, caps, the $268/ton math, the May 1 filing, the Good Faith Effort pathway, and the 2030 cliff — with a readiness checklist.
Benchmarking & Energy Grades
LL84/LL133/LL33/LL87: what to file, when, and what the lobby letter grade is telling buyers.
Facade Safety (FISP/LL11)
The 5-year cycle, SWARMP vs. Unsafe, and the four questions to ask your engineer.
Mechanical Systems
Gas piping (LL152), boilers, elevators, cooling towers (LL77), backflow: cycles, inspectors, filings.
Board Operations
HPD registration, lead paint, bedbugs, meetings and fiduciary duty, insurance, alteration agreements.
4 Ready-to-Use Templates
Annual compliance calendar, LL97 readiness checklist, capital-planning worksheet, vendor bid comparison.
Annual Update Bulletin
Every January: rule changes, enforcement numbers, the 2030 countdown. $99/yr renewal. The $99/yr renewal is an automatic annual charge starting 12 months after purchase. Cancel anytime from the link in your renewal email; you keep the kit.
Why not just hire a consultant?
You should — for the engineering. This is the companion: the reference that lets the board oversee the consultant, ask the right questions, and never miss a deadline between engagements. Consultants charge $3,000+. This is $299, and it makes the $3,000 smarter.
Pricing
Less than one month of sidewalk shed rental.
PM Suite: one subscription for your property operation
Bedrock Proof tracks vendor insurance ($129/mo), AlignBid runs capital project bids ($179/mo), TurnBatch handles unit turnovers ($149/mo). Separately $457/mo. As the PM Suite: $349/mo, about 24% off, plus the $299 Board Desk compliance kit included free.
PM Suite launches alongside TurnBatch. PM Suite subscribers: email hello@nycboarddesk.com from your subscription email address and we will send the Board Desk kit free.
FAQ
Is this legal or engineering advice?
No — it's an educational reference. Your attorney and engineer handle your building's specifics.
Our managing agent handles compliance — do we need this?
Your agent does the paperwork; the board carries the legal responsibility. This is how you verify, not just trust.
Our building is under 25,000 sq ft — is LL97 relevant?
Probably not directly, but most of the rest of the kit still applies: facade rules (buildings over 6 stories), gas piping, boilers, elevators, cooling towers, and everything in the operations guide. Benchmarking applies at 25,000 sq ft and up (or to condo groups totaling 100,000 sq ft). Check the coverage sections first.
What if the laws change?
That's what the $99/yr update is for — the January bulletin covers every change, every year, through the 2030 cliff and beyond.
Sources
- $268 per ton of CO2e over the Local Law 97 cap: NYC Department of Buildings enforcement figures, via Facilities Dive, September 2026; see also the DOB enforcement presentation, February 2026.
- $678,000/year example: illustrative calculation, October 2026. A 750,000 sq ft multifamily building at 50% over its 2024-2029 emissions limit (0.00675 tCO2e per sq ft): 750,000 x 0.00675 x 50% x $268 = $678,375, rounded. Actual fines depend on building type, limit, and the current year's rate.
- First LL97 fines issued: DOB sent 164 emissions non-compliance notices in the first compliance year and had collected about $270,000 in penalties from roughly 15 owners by September 2026, per DOB officials via Facilities Dive.
- Benchmarking due May 1, $500/quarter fines: NYC DOB, LL84 Benchmarking Violations: penalty of $500 per quarter until the benchmarking report is submitted, up to $2,000 per year.
Figures verified October 2026. Rates, limits, and enforcement figures change; the January bulletin tracks updates each year.